全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册
高低压配电领域元器件及系统解决方案提供商

New Case Study: Power Plant Automation Retrofit


发布时间:

2018-04-23

SATEC PM180 devices in the first modern system in Mongolia for fault registration, monitoring, control and high accuracy energy metering focusing on the quality and reliability.

MSEL (http://www.msel.mn/ ), SATEC's partner in Mongolia and one of the well-known company in the Mongolian energy market, designed and built the first modern system in Mongolia for fault registration, monitoring, control and high accuracy energy metering focusing on the quality and reliability. The system incorporates 39 SATEC PM180 devices, 3 Ethernet switches, a DELL server, 5 electrical cabinets, SEL-2488 satellite-synchronized network clock and SEDMAX software.

关键词: